The project included the following technical measures: 1) Installation of 32,4 kW roof-based PV power plan (60 PV panels with capacity 540 W each), 2) Installation of auxiliary equipment (invertors, meters, cabling, etc.), 3) Development of the feasibility study for construction of the PV plan (150 kW capacity) for the municipal water supply company.